Planning preventive maintenance for a rehabilitation department
A practical checklist for keeping physiotherapy and rehabilitation equipment safe, accurate and available.
Why plan maintenance
Therapy equipment that fails mid-session costs treatment time, and equipment that drifts out of calibration may still run while delivering less than it displays. Scheduled preventive maintenance (PPM) finds wear and faults before they stop a clinic, and gives you a record that each device was checked.
1. Build an asset register
List every device with its make, model, serial number, location, installation date, warranty end date and supplier contact. This is the foundation for scheduling and for any audit.
2. Set intervals from the manufacturer's guidance
Use the service intervals in each device's instructions for use. Shorten them for equipment that is used heavily, moved often, or critical to your caseload.
3. Prioritise by risk and use
Devices that deliver energy to patients, such as lasers, shockwave, TECAR and electrotherapy units, and equipment that supports patients' weight, such as treatment tables and anti-gravity treadmills, usually deserve the highest priority.
4. Schedule around clinic hours
Book visits when equipment is least needed and group devices by location so one visit covers several machines. Agree in advance what happens if a fault is found during a visit.
5. Keep a record against each machine
Record the date, checks performed, findings, parts replaced and the next due date for every device. With TRIMAX, PPM visits are recorded against each machine, and customers can view installed equipment and service history in the TRIMAX equipment portal.
6. Track consumables and accessories
Electrodes, gels, cables, handpieces, lenses and protective eyewear wear out or get damaged. Check them at each visit and keep spares for items that would otherwise stop treatment.
7. Train and refresh staff
Many faults start with handling. Brief new staff on daily checks, cleaning and correct use, and refresh training when equipment or staff change.
8. Plan for downtime
Know how to report a fault quickly, what information the service team needs (model, serial number and what is happening), and how treatments will be covered while a device is out of service.
Next step
TRIMAX's Kuala Lumpur team provides installation, scheduled PPM, repairs with free estimates and equipment training. See our service options or request a maintenance plan.